Free Estimate
Photo Gallery

Mudjacking VS PolyLEVEL



Mudjacking VS PolyLEVEL
Next Photo

One of the many differences between mudjacking and PolyLEVEL is the hole that has to be drilled in the slab before lifting.  Once the slab has been lifted the holes are filled with concrete.  After mudjacking the hole is patched and a very noticeable "puck" can be seen after the patch has set.  Unlike the the penny size hole from PolyLEVEL which is hardly noticeable after the project is completed.  

Our Service Area

We serve the following areas

Our Locations:

Innovative Basement Systems
1330 41st St. N
Fargo, ND 58102
1-701-540-0927


Innovative Basement Systems
1325 S Frandsen Ave
Rush City, MN 55069
1-320-204-0302
Top